中文 Español
Home --- Applications --- Display series --- Highway VMS

Jiaxing -Shaoxing River Crossing Project

2016-12-05

Total length:43.2615k;  it was designed by both-way with 8 traffic lanes, roadbed width : 42m, design speed: 120km/g. The bridge culvert as the same wide as Roadbed.